May 22 delivery of 800 US^2, start of installation on 750/89 and 500


Crane ready to lift crates from truck

 
 
 
 






Opening the box, ready and attaching the lifting frame

always has to be some coffee->


The 750/89 out of its box..


 


800 US^2 still on its way...


 


Crates entering main magnet lab


500 US siting (temporary before 800 arrives)


Masters of all they survey...

Covering a neoprene floor junction so that the air skates can operate

Preparation of 750/89


800 US^2 crawls its way in...


Be assured that this is not the regular air compressor (it's for the air skates)